40% replanked in 7/8 Sapele.
8500 #12 Stainless wood screws
4000 #12 Silicoln bronze screws
15 Gallons of epoxy fairing putty
over 6,000 man hours
Refastended with Stainless #12
Sapele planked over original
Cut stairwells
Epoxy glued/sealed
4 coats of epifanes clear varnish
New watertight decks. A new enclosure made of light weight structural foam fiberglass sandwich panels. Custom mahogany slider doors with double pane windows.
Constructed in light weight structural fiberglass foam sandwich panels. Increased size and reduced weight. All epoxy construction with seating for 10. Replaced ladder access with stairs. Trimed in epoxy coated beautiful sapele with 4 coats of epifanes clear varnish
Inspected from Stem to Stern, all new bronze keel and chine bolts, all structural repairs made. Repainted, sound insulated, completely new fuel and water systems. Hydraulic steering, rewired and updated electrical systems, new modern 12kw genset
15% replanked with Sapele and #12 silicoln bronze wood fasteners. New Prt & Stb forward most chines and 15' of keel replaced with Purpleheart. Replacement of keel joint lock. 30 new silicoln bronze keel bolts. All strut bolts replaced and backing blocks replaced